Nooksack: Behind Schedule, but Moving Forward

With my wife's help today, the Nooksack backdrops and modules are in place! Now I can finalize the installation of both by going through this checklist:

  • Checking for level
  • Bolting rather than just clamping the legs in place
  • Screwing the benchwork to the L-girder along the back
  • Nailing and screwing the backdrop panels in place
  • Taping and mudding the first coat on the seam and nails in the backdrop

Then I can move on to some other important first steps:
  • Instal the existing LED lights over the benchwork
  • Move and set up the DCC command station 
  • Set up the control panel and touch toggles
  • Check all electrical
    • Track Power
    • Cab bus
    • Tortoise power and action
    • Identify and fix any issues

In theory these should all be fairly straightforward tasks. We shall see. Then I can move on into the next phases following the TOMA approach. I have some ideas for most of these, but I really wanted to get Nooksack working before going too far with any of them.

  • Staging
  • Scenery and structures
  • Operations
  • Rolling Stock
  • Presentation: Valance, skirting, floor paint etc. 