When we returned from our visit to Maine, I first tackled the second coat of floor paint. Now all of the basement floor under the current benchwork is painted, although not all of the basement floor is painted. I will need to do quite a bit of organizing to get to that stage. My plan is to continue with one section at a time. The workbench and storage area will be quite a procedure to avoid painting around benches and cabinets.
At that point the next step was to add track to the so-called drop down section. The flextrack that I ordered had arrived right before our trip, so I was ready to proceed. I did have to dig out some ballast and ties at the end of the existing track to fit in joiners, but other than that fiddly work with a hobby knife it all went smoothly. I still will need to solder those joiners for fool proof electrical connection, but they are working for now.
Now that all the track is in and wired, as I see it my next steps include running some trains and planning my initial operations scenario. I want to make sure that everything is working well before I move on with steps such as scenery.



