Willow Junction with backdrops up and a view of the program track control switch. |
Willow Springs switching district benchwork up, leveled, bolted together, and backboard installed. |
I am trying to compensate somewhat for changes in temperature and humidity in the attic by priming the underside of the benchwork sections and the back of the tempered hardboard backdrops as they are installed. I still need to tape and mud the joints between sections of the hardboard before I prime and paint them.
Now that the benchwork is complete on the second side of the layout, I can mock up my track plan in place. I already have some questions and potential changes from my initial plan.
So, here is my "To Do" list from April with changes (or not) . . .
To Do:
- Benchwork finalized and in place Done, check it off!
- Backdrops finalized: seams, primed, and blue
- Workbench and materials organized Ikea rolling cart put together and some materials organized, but still more boxes and clutter to deal with
- Regular posting to the blog Not so much, gotta work on that!
- DCC components set up Yes, but now replace with bus wires installed
- East staging and a program track wired Started, but I need to finish
- Start work on rolling stock and loco roster and maintenance
- Start some track work Connection to East Staging and interchange will be the focus
- Full size mock up of Willow Springs switching district
- Start a building or bridge Started plans and construction for curved trestle, need to get back on this
- Design the fascia and valence Some ideas, but I need to firm up with cardboard templates.
- Along with valence, figure out the lighting