Train instructions for two crews |
The first, and perhaps most important overarching observation, was that although space was tight, more than just a couple of folks fit in the train attic; two crews of two, an observer, and myself as dispatcher all managed to navigate around each other. The next consideration was whether the existing layout has enough work to split the sequence operations for one crew into two and/or whether sequence operations is the best way to go with two crews. While everyone claimed to have fun, I noticed a couple of issues.
Potential Nooksack track plan |
With the two-crew sequence operations, the Greenrock Turn Extra needed more work to do. Once Nooksack is operational, the second crew will have more action with that train than just dropping cars at the passing siding. Working Nooksack with its cannery and lumber mill will potentially even out the work levels between the two crews. Also, when the second crew was running passenger trains, the first crew didn't know when to clear the main without the addition of a timetable or fast clock. With the layout in yard limits, sequence operations worked fine until the addition of first class passenger trains. Until some form of clock is introduced, it will be up to the dispatcher to be the clock! Another issue for the second crew was the amount of fiddle work that needed to be done in the east staging with two trains turning there. The east staging was not really adequate for that task and comprises one of the so-called "needs" that I noted.
New label cards for unbuilt industries |
Disturbing end to east staging |
As mentioned earlier, this trial run pointed out the inadequacies of the east staging module. With trains needing to be turned here, the addition of my Atlas turntable and/or some kind of cassette would eliminate the need to pick up and re-rail rolling stock. Additional length would also be useful. Again, as with an earlier visit, visitors found the tracks leading into an abyss at the end of staging tracks nerve-racking. At the very least an end plate should be added.
Finally, several "needs" that I was already aware of should be addressed before operation becomes a regular occurrence. Safety issues around the attic trapdoor and stairs and convenience issues of holders for picks, pencils, and clipboards and/or shelves for dealing with paperwork are all still issues.
Uneven gap in upper rail at trestle |
While adding the Nooksack section would substantially improve multiple-crew sequence operations possibilities, operating with more than one crew can continue before that addition to the 4th Subdivision. Possibly simplifying the multi-crew train instructions, clarifying and defining the role of the dispatcher, and taking care of some of the issues described in this after-action report would allow for smoother sequence operations. While I have the lumber on hand and just ordered track and turnouts in the last few days, I want to achieve more "completeness" on the existing portion of the layout before starting the new section.