With my wife's help today, the Nooksack backdrops and modules are in place! Now I can finalize the installation of both by going through this checklist:
- Checking for level
- Bolting rather than just clamping the legs in place
- Screwing the benchwork to the L-girder along the back
- Nailing and screwing the backdrop panels in place
- Taping and mudding the first coat on the seam and nails in the backdrop
Then I can move on to some other important first steps:
- Instal the existing LED lights over the benchwork
- Move and set up the DCC command station
- Set up the control panel and touch toggles
- Check all electrical
- Track Power
- Cab bus
- Tortoise power and action
- Identify and fix any issues
- Staging
- Scenery and structures
- Operations
- Rolling Stock
- Presentation: Valance, skirting, floor paint etc.

No comments:
Post a Comment