![]() |
| First Plan: Proof of Concept |
![]() |
| Second Plan: Include Return Loops |
![]() |
| Third Plan: Inspired by Iain Rice |
The purpose of this blog is to document and share the planning, construction, and operation of a small HO model railroad set in the Pacific Northwest. Discussion of "Version 2" of the model railroad starts in the fall of 2021.
![]() |
| First Plan: Proof of Concept |
![]() |
| Second Plan: Include Return Loops |
![]() |
| Third Plan: Inspired by Iain Rice |
As mentioned as a possibility in my last post, while still in design mode for the new 4th Subdivision, I have started a small "practice plank" as a first layout in the basement. In addition to engaging in active modeling, Ingleton will provide an opportunity for self analysis for the strategic planning needed for the design of the larger layout, and perhaps more importantly review and practice existing skill as well as learn new ones. This shelf is a bit less than a foot deep and six feet long, so it will definitely be small and simple.
In mounting what Lance Mindheim calls "the board of education," I realized that a finished look with a museum or theatre approach is important to me. The use of a backdrop is also important as I clearly want to look at the layout as a 3D artwork. While Ingleton will not have coved corners, even with a "practice" layout, presentation and backdrop are critical to my enjoyment and approach to model railroading.
![]() |
| Unpacking and setting up the workbench has begun |
Having started unpacking my model railroad materials and setting up my modeling work area in the basement, I am itching to build something before Version 2 of the 4th Subdivision is designed. In chatting with more experienced model railroaders and reading some of the design experts, one of the recommended first steps in planning a model railroad is to evaluate one's interests and visions by answering a number of questions. By initially building a small shelf railroad I will gain some more practice and experience which may help me answer some of those questions, build some additional skills, and get myself back into active modeling while I plan and prep for the larger model railroad.
![]() |
| Likely spot in the basement for a "shelf" layout |
One of the decisions that must be made in conjunction with, if not directly impacting, other decisions is the location of the model railroad. I have three options and started the process by analyzing the pros and cons of each.
![]() |
| Our Garage |
![]() |
| The Basement |
![]() |
| One of the Attic Rooms |
![]() |
| Existing Shelves for Magazines |
As we are starting to settle in to our 1930 colonial revival home in the Poconos, I am starting over with Version 2 of the 4th Subdivision of the Cascade Division of the Great Northern. While I have made a few decisions, I still have quite a few more to make to move forward with planning/designing the new railroad.
![]() |
| Tobyhanna Station |
While a lot of railroad history exists near here, suggesting a switch to a different theme, I am definitely staying with my Great Northern and Pacific Northwest theme. On a basic level, I have invested a fair amount in research and equipment. Both time and money are scarce enough resources that I am not prepared to totally start over. On a more esoteric level, I have emotional and aesthetic investments and interests in that modeling theme. My planning will continue to be based on a freelanced 4th Subdivision.
Moving forward, I will need to contemplate a series of decisions in conjunction with initial planning. While I don't want to be bogged down with layout room preparations or paralysis by analysis, I don't want to start slapping things together willy-nilly either.
As I attempt to make these decisions, I expect that this blog will be the workplace for working out the questions and answers or pros and cons.
With packing and planning for our move, my thoughts have turned to lessons learned from the 4th Subdivision built in the attic of our current house. I think that I have learned a lot and improved my skillset as a model railroader through working on this model railroad and through my friendships with others in Division 12. With the upcoming move, I will have a chance to start over reflecting on what worked well, what I would do differently, and how I see myself now as a model railroader.
One initial and central thought is to be more aware of the space in which the layout will be built from the beginning. Many times I found myself putting off working on the railroad because the attic was too hot or cold. As I started joining groups of other railroaders and forming friendships, I learned that I might be less of a lone wolf than I initially thought. Having visitors or holding open houses and small operations sessions are definite possibilities (as we hopefully move out of our pandemic situation), so I need to consider the comfort of the space in which I will be working as well as allowing space for others to join me right from the beginning. As my wife and I search for our new home, space for the railroad is one of our "must haves."
Whether it is already finished or finishing the space will be a first task, the railroad space will need to be comfortable. Heating and cooling the train room will be a major consideration. Headspace, moisture, lighting, access to electrical outlets, dust prevention, aesthetic considerations, and having sufficient space available will all factor in. While I don't want focusing exclusively on improving the train environment to prevent me from starting the railroad in a reasonable amount of time, I don't want to repeat the same mistakes I have made in the past. Theoretically I learned from the attic layout that not having suitable HVAC or more than one outlet were hard to rectify after the railroad construction was well under way.
![]() |
| Coved corner and 24" radius with easement |
![]() |
| Existing scenic divide situation to be avoided |
When I started this blog, my wife and I had just moved from Seattle back to Meadville, my hometown and the town where we met attending Allegheny College in the 1970s. Part of the rationale for moving from the west coast was to be closer to my wife's family. One consequence of living through the COVID-19 pandemic this past year has been realizing that we are still too far from her family. With minimal stops, it is a six-hour drive each way across Pennsylvania to visit them in Western New Jersey. While flying from the west coast was more complicated, it still remains a multiple day excursion to visit with them.
In recently chatting on email with one of my model railroading friends, I noted that I seem stuck between first planning phases of moving to be closer and making progress on the current 4th Subdivision layout in our house here in Meadville, without much progress on either.
Without further analysis of my struggles with inertia, let me discuss what I have been learning about moving with a model railroad. Two resources have been very helpful in focusing on the railroad in planning the move. Brooks Stover's article in the August 2020 NMRA Magazine, "Downsizing Does Not Mean Settling," gives advice on packing for a move, as does one written by William Lyders, "Moving: Dismantling A Layout Then Getting It Up and Operating Quickly" found in the NMRA Members Only Section: https://www.nmra.org/sites/default/files/sr202004-movingalayout.pdf.
For packing model railroad materials, building an inventory is an associated task important for the move as well as future insurance or estate purposes. Stover suggests that various small containers including zip lock bags help organize the small bits. He also suggests labeling the boxes on top and on front.
Here are the first couple of boxes. I included a box number, brief description, and whether the contents are already on the "box list" and "inventory" on the labels. I also left room on each label for more information as we get closer to the move. Once we know where we are moving, I will include information about a more specific location where the box should end up at our new house. The box list is a general list of all boxes as we pack, including the rest of the household items. The inventory is specific to the model railroad.