Learning Points:
- I should order some City Classics corner braces or try another approach to corner bracing and gluing.
- I should also thoroughly investigate new products or at least try them out on scrap material before using them.
The purpose of this blog is to document and share the planning, construction, and operation of a small HO model railroad set in the Pacific Northwest. Discussion of "Version 2" of the model railroad starts in the fall of 2021.
In addition to ongoing planning for the 4th Subdivision and a few, first, small steps towards "finishing" the basement layout space, I have continued to work on the Ingleton track since my last post.
After scrubbing the areas where the track had been soldered with denatured alcohol and a toothbrush as well as replacing missing ties, I prepped to paint the ties and rails with my airbrush. I explained this process in detail in an earlier post from my former layout. I did make two changes to my technique here on the Ingleton shelf: I thinned the Microlux paint with Vallejo thinner instead of 70% isopropyl alcohol and I used a paint stick to initially clean the rail surface instead of a Bright Boy.While working on the Ingleton "practice plank" over the last few weeks, I tried to work towards bulletproof track and electrical continuity. I set as one of my goals for this small switching layout to run flawlessly whether as a switch job or a puzzle.
As a first step, I prepped the two Peco Electrofrog switches by following what I now think of as a seven- step process first explored in an earlier post. I find the Peco turnouts operate reliably and their powered frogs, whether using frog juicers or the toggle switches built into turnout motors, eliminate hiccups with locomotives running through the turnouts.
In the photo, one of the turnouts, placed on the workbench, is ready for prep work. I ordered thinner (.032) solder before starting to see if I can improve my soldering technique.
Steps in prepping Peco Electrofrog turnouts:
Once I had all the track fitted into place, I soldered the rail joiners and the one feeder that I had forgotten. I soldered that one feeder under the track after the track was in place. Because of supply chain issues, I wasn't able to find the clear or gray caulk that I had planned to try as a track adhesive. My alternate plan included spiking the turnouts using the four holes that I had drilled with the pin vice in each turnout. I also used Weldbond adhesive for the ends of the longer pieces of track. We will see how that holds up, but initially I like using Weldbond as a track adhesive. After drying overnight, the shelf was ready to turn over onto sawhorses for wiring.
I found working with the plank upside down on sawhorses so much easier than working under the benchwork -- a real incentive to build a layout in sections that can be worked on up on sawhorses or the work table. Having seen no long term issues with 3M suitcase or "insulation displacement connectors" in my previous layout, I continued with them. I did try a new technique (to me) of twisting the red and black 14 gauge bus wires together. I have read that NCE recommends doing this, and I thought I would try it here. Again, with working with small sections of benchwork at a time, it is not difficult to do. I marked where the shelf brackets will be with a sharpie, and connected the feeders and Tam Valley Frog Juicer with room around the bracket locations.After setting the shelf back in place and connecting the DCC system, I successfully ran the 0-6-0 locomotive through all the turnouts both forwards and in reverse. The track and wiring are complete, and it is time for me to start on scenery, structures, and rolling stock.
![]() |
| First Plan: Proof of Concept |
![]() |
| Second Plan: Include Return Loops |
![]() |
| Third Plan: Inspired by Iain Rice |
As mentioned as a possibility in my last post, while still in design mode for the new 4th Subdivision, I have started a small "practice plank" as a first layout in the basement. In addition to engaging in active modeling, Ingleton will provide an opportunity for self analysis for the strategic planning needed for the design of the larger layout, and perhaps more importantly review and practice existing skill as well as learn new ones. This shelf is a bit less than a foot deep and six feet long, so it will definitely be small and simple.
In mounting what Lance Mindheim calls "the board of education," I realized that a finished look with a museum or theatre approach is important to me. The use of a backdrop is also important as I clearly want to look at the layout as a 3D artwork. While Ingleton will not have coved corners, even with a "practice" layout, presentation and backdrop are critical to my enjoyment and approach to model railroading.
![]() |
| Unpacking and setting up the workbench has begun |
Having started unpacking my model railroad materials and setting up my modeling work area in the basement, I am itching to build something before Version 2 of the 4th Subdivision is designed. In chatting with more experienced model railroaders and reading some of the design experts, one of the recommended first steps in planning a model railroad is to evaluate one's interests and visions by answering a number of questions. By initially building a small shelf railroad I will gain some more practice and experience which may help me answer some of those questions, build some additional skills, and get myself back into active modeling while I plan and prep for the larger model railroad.
![]() |
| Likely spot in the basement for a "shelf" layout |