Sunday, October 25, 2026

Updating the Cab Bus

 

One of the new UTP-CAT5s

Up to this point in time, the 4th Subdivisions's NCE system has relied on two six wire UTP panels on the Nooksack section and my one radio throttle. With the addition of East Branch, the sceniced staging section, and the new "Phase Two" sections. I wanted to expand the Cab Bus capabilities. With the enlarged railroad, particularly the Ferndale Yard section. I needed to plan on the potential of having additional operators. I purchased two UTP-CAT5 panels using the more robust CAT5 cable to expand the Cab Bus. 

Schematic Sketch of the Updated Cab Bus

I started by replacing the UTP connected directly from the command station with one of the new UTP-CAT5s.It functions as a Cab Bus splitter with one side headed towards the other original UTP installed in Nooksack and the other side headed towards Ferndale Yard using CAT5 cable. 

Interlocking Switch and new panel near Ferndale

An issue I found with running the CAT5 cable through the new benchwork had to do with the size of the cable connectors. I had to head out to the big box store and buy a 5/8" drill bit to run the cable through the benchwork. Cutting an opening for the panel at 1" X 2 3/8" was easy; I drilled 1/4" holes in the four corners after marking the opening and then used my jig saw to complete the cuts between them. As seen in the photo, I still need to dress the loop of extra cable. As the TOMA expansion grows, the Cab Bus can continue using CAT 5 cable from here. 

Testing the components running east from the splitter

Moving from the splitter to the original Nooksack panel just involved plugging some of the six wire cable in place. Seen in this photo, I went ahead and tested the UTP that I replaced with the splitter, a longer piece of six wire cable that I had on hand, and the radio receiver. I have held on to the six wire cable from my modular days in Seattle years ago, and I was relieved to see that it has held up. 

NCE radio base station and UTP 

I used the other original UTP here at the end of East Branch. I constructed a small shelf to mount on the legs of the module in order to hold the radio base station. I used some scrap lumber to fashion the shelf that I later mounted with 1/4" bolts and wing nuts. At this point, I am comfortable that I could have another operator. I have my radio control throttle and a standard coil wired throttle as well as my PowerCab from the Ingleton layout that can work as a standard throttle.

While I still have a punch list of small electrical projects to complete before I transition my rolling work cart from electrical to scenery, this project seemed like biggest obstacle to that transition.

Thursday, October 8, 2026

Something Has Been Bothering Me

 


I tried an experiment over a year ago, combining two photo backdrop techniques: one, that I call "cove the road," and a technique from Paul Dolkos of using small photographed scenes between "visual foils." I described creating this image in an earlier post of a packing house scene that I reimagined by collaging parts of it. In addition to not having suitable visual foils on both sides yet, I just have not been happy with the results. Since I am presenting a clinic on backdrop techniques at the MER convention later this month, I wanted to try to resolve my issues with it and to solve the problem that was bothering me. Basically the initial painted treeline behind the packing house scene created issues of perspective and scale. The one-point perspective of the photo suggested a different horizon line than the one suggested by the painted tree line. More bothersome in a way, the photo suggested greater distance or depth into the scene than the flat treeline that it was in front of. Part of that illusion was because the scale of the forced perspective buildings of the photo did not align with the scale of the trees in the tree line. 

While I had attempted to overpaint the tree lined ridge over the past few seasons, it took my committing to repainting the surrounding area, which I finally did just a couple of weeks ago, to nudge this towards a scene that I think is much closer to working. As the small building's dock in the front of the scene will be the structure I use, I will need to come up with a visual foil or three-dimensional object to hide the edge of the photographed section behind the dock. In repainting this section of the backdrop, I used two recent understandings (both relatively new to me). The translucent nature of white latex primer made it nearly impossible to completely cover a darker color, but helped to blend into the existing sky and to create the illusion of atmospheric haze. I ended up overpainting the original tree line with titanium white artist's acrylic to completely obscure it. Thinking about how my brown earth latex color appears much darker on the backdrop than on the benchwork due to the layout lighting directly overhead, I chose to paint the fields and hills with craft acrylics, particularly a khaki color that was similar in value to my earth brown as it appears on the benchwork. 

As I work to add scenery layers to this area, I will need to consider what to use as "visual foils" on both sides of the added photo, but now I am much happier with how it integrates with the newly painted backdrop here. Rather than bothering me, I think this scene now helps blend the backdrop into the 3D modeled area and suggests greater depth. 


Thursday, September 17, 2026

Phase Two Operations Planning

Schematic of Phase One and Two

The trackwork is all working, and my plan is to work on my initial operations planning while unpacking and checking rolling stock. As I mentioned in my last post, I want to make sure everything is working smoothly and aligning with a first phase operations approach before moving into track painting, ballasting, or other scenery. 

The advantage of including the Ferndale Jct. yard and the Great Northern interchange with the mainline in Ferndale is in providing both a connection to the rest of the world and for a diversity in roles for a solo operator. Byron Henderson explicitly recommends including a classification yard with switching operation for solo operators in a post on his Layout Vision website to highlight a variety of roles with resultant "fun". When or if I move into having others visit to operate, I may want to work towards the NMRA Dispatcher Achievement Program. Their minimum requirements include "at least two mainline trains plus yard switching in simultaneous operation." Even if I am not working towards the NMRA's operations AP certificate, I find their AP programs provide structure and guidance; why not plan to meet their minimum? 

My approach is to start simple and then build complexity. This approach aligns with the fact that I will be operating by myself. Again, why not align my simple start with the NMRA AP framework minimums of "some system of freight and passenger train and car movements." 

I intend to start my initial solo operations, at least formal solo operations using a "sequence of trains" traffic control system. In an earlier post, I described how I might use Daily Train Line-up forms in such a system. Now, in order to use a sequence of trains system, I will need to start by figuring out what trains I plan to sequence. This will be based on the story I am attempting to tell as well as the industries and rolling stock I plan to use. 


In the engineer/conductor role, I plan to use switch lists to provide the information needed for car forwarding. I provided an overview of switchlists in a post from a number of years ago. At least in solo operations, I plan to just use a switchlist to provide the information needed to accomplish the car pick ups and set outs that are planned for that train's job. As the 4th Subdivision grows beyond phase two or as the operating crew grows the paperwork may expand, but for now a switch list is it for the train crew. While I have a number of these switch lists on hand, I have two changes that I might make on the master before having more printed: a more era appropriate logo and the addition of AAR codes for ore and covered hopper cars.

Yesterday, I started unboxing some rolling stock, focusing on what I call the "Rock Train." Part of this train is made up of the transfer of limestone from a quarry near Sumas, Washington on the NP line to the Olympic Portland Cement Company in Bellingham, Washington. In real life this transfer was done on a Milwaukee Road line, but in my version the GN 4th Subdivision was in Whatcom county, not the Milwaukee Road. Also in the so-called Rock Train would be covered hoppers transporting silica sand from a (fictional) silica sand quarry near the end of the branch. 

I cleaned wheels, checked couplers and weight of the four or five cars ready for this train that I unboxed. I also checked that they had appropriate waybills in their existing car cards. While unboxing them, I also gathered some other cars that are on hand, but need work to be a part of the rock train. I ordered an NP gondola from ebay to also bolster the rolling stock for this major revenue and traffic source for the 4th subdivision. The car cards and waybills will be needed for classification in the yard, even though they will not be used by the switch crew. 

Although I will be a solo operator, I see that as the system develops I will need to (or get to) fill several roles: engineer, yard master, and traffic manager or freight agent.
 

Monday, September 14, 2026

Ferndale Jct. Yard Updates


When we returned from our visit to Maine, I first tackled the second coat of floor paint. Now the basement floor under the current benchwork is painted, although not all of the basement floor is painted. I will need to do quite a bit of organizing to get to that stage. My plan is to continue with one section at a time. The workbench and storage area will be quite a procedure to avoid painting around benches and cabinets.

Once the floor paint was dry, I worked on the runaround track. I have explored prepping Peco Electrofrog turnouts here before, My first step was just that, prepping the turnout. To avoid potential kinking, I soldered an extension to a full length of flex track. I also soldered feeders under the rails before fitting the runaround in place. To finalize the wiring of the runaround I also added a piece of track and powered it leading into the turnout.

At that point the next step was to add track to the so-called drop down section. The flextrack that I ordered had arrived right before our trip, so I was ready to proceed. I did have to dig out some ballast and ties at the end of the existing track to fit in joiners, but other than that fiddly work with a hobby knife it all went smoothly. I still will need to solder those joiners for fool proof electrical connection, but they are working for now.


Today I completed the controls for the two turnouts going into the yard from the mainline. I've had the switch machines wired to power appropriate DCC power to the frogs since I installed the tortoises, but I hadn't had the switch motors themselves powered. These two turnouts are controlled by a toggle switch so they both throw together, either both straight into the yard or both "diverging" with the mainline curving to the left and the drill track set out of the yard. Down the road, my intention is to set up interlocking signals for this pair of turnouts.

Now that all the track is in and wired, as I see it my next steps include running some trains and planning my initial operations scenario. I want to make sure that everything is working well before I move on with steps such as scenery.  


Thursday, August 27, 2026

Can't Decide? Start Both

In a recent post, I left off undecided about whether to continue with work at the end of Ferndale Junction Yard or to return to infrastructure work. Instead of deciding, I started both. In this past week I became a little bit sidetracked (literally, as I have been putting together the new edition of my NMRA division's newsletter, the Susquehanna Sidetracks). My wife and I were just invited to her brother's last minute vacation in Maine, so both projects will be on hold. I am posting a status report and a punch list, so I'll be ready to resume on our return.

The main infrastructure project that I wanted to work on was to continue with floor painting. I took down the temporary workbench on folding sawhorses and moved the rolling cart and storage tubs from under the Nooksack/East Branch section of the railroad. I vacuumed and washed the floor before tackling the painting. Sadly, I don't think that I will get to the second coat before we leave, but  it's ready for that second coat and storage organization. 


Here at the drop-down section at the end of the yard, I haven't made much progress on the removable coved backdrop section beyond taking some measurements. I did however work on the roadbed, which is now glued in place. I hit a bit of a snag though with laying track; I didn't have enough to extend all the tracks. I ordered what I hope is enough, but it just arrived. On our return I can get back to completing the track work and wiring. 

In addition to the trackwork on the dropdown section, I still have some work to do to complete the new runaround track:

  • Prep the turnout
  • Solder an extension to the runaround
  • Add feeders and fit the runaround
  • Decide on technique for drop down track wiring and gaps
  • Mind the gap at the power district junction

Tuesday, August 11, 2026

Phase Two Mainline Extension

 

Short clip of GN 229 backing out of staging on a trial run of the just completed mainline extension.

Since my last post, I have worked on several of the steps mentioned there. This past week, I narrowed my focus to adding a small extension to connect the mainline to my existing three-track staging module. A track plan sketch from this earlier post , just as I started the Phase Two work, provides an overview. 

With the Ferndale Junction and new modules in place, I needed to work out a finished design for the extension. As I intend the extension to be part of the permanent  railroad and join further TOMA expansion later and work for now as the access to staging, I had to keep both of those parameters in mind. To complicate both issues, a nearby basement support pole needed to be factored in.  




My first step consisted of clamping a cardboard box in place and creating a paper template. The template showed both the shape and size of the extension and allowed me to test out both the placement of my existing staging and whether a full turn-back curve would clear the metal support pole.


I designed and built a grid framework on the template on my workbench in the garage. Using my miter saw and brad nailer made for fast work laying out, cutting, and glueing up the frame. Based on the template, the frame is not quite square allowing the staging track to clear the support pole. It also allows for the curve planned for the end of the aisle here once the future TOMA peninsula expansion takes place.



This photo shows the module completed, primered underneath, and bolted into place. Knowing that different modules will be attached, I used a forstner bit to create a recess for the bolt heads at the end of the module. 



With the temporary staging C-clamped in place, I was able to finetune the curved track location and then mount the cork roadbed. I also double checked for a future 180 degree turn, and it appears that this extension will work with the planned future peninsula, when I ever get to that point.


Today I soldered two pieces of flex track together before bending it into the long curve. With the iron out, I soldered two feeders under the rails before finalizing the track into position. I extended the DCC bus into this new section and attached both the feeders and the wire to the staging. After then cleaning the track I had just installed and on the staging module, I went ahead and ran a locomotive. The short video at the beginning of this post shows the locomotive running smoothly over this new section. 

I have not yet decided whether to shift to the drop down section at the end of Ferndale Junction and the last bit of backboard there or to return to infrastructure and more floor painting next. Either way, I feel pretty good about connecting the staging and being in a place to unpack some rolling stock and run trains.

Tuesday, July 28, 2026

Phase Two Modules In Place

 

Many of the initial next steps for the new module mentioned in my last post are now in place. I leveled, shimmed, and bolted this module to the Nooksack module. I drove a couple of screws through the L-girder ledger into the grid frame and bolted the one leg into place as well. In this photo, one can see a length of track that I fit onto the end of the module before soldering the track joiners. As the phase two modules make up a second power district, I left a gap between the rails at the module joint and attached this end of the DCC bus to a second circuit breaker.

Again, I mentioned a number of steps to take while the Ferndale Junction module was up on the sawhorse workbench in my last post. In this photo you can see those steps completed: bus wires flagged with correct colors, piano hinge installed, frog juicer attached, and all existing DCC and frog feeders connected. 

While not as firmly in place, the Ferndale Junction module is level and bolted to the adjacent new module. I have started working out the location for the turnouts for the run-around track, so I can install the roadbed. I want to focus on the roadbed and track for the run-around as well as track between these two newly installed modules in order to finalize the wiring enough to run some trial trains. I will need to make sure the two  turnouts on the new module are set up properly as well as the ones on the run-around. 

My intention is to add a bit of an extension to the benchwork here at the connection between the modules. The mainline will be curving away here to the left, and for phase two, I hope to attach my three-track unsceniced staging mini module here. This will require some additional template making and track planning. At the far end, I still need to finalize the drop down segment of the yard. It is hinged to ease future access to the well plumbing and tank.

Here at the far end with the drop down section, I will need to design a removable extension of the backdrop incorporating a curved or coved approach. That should be an "interesting" project! I also need to figure out how to hang the light fixture for this end. This area of the ceiling is a little different, so I don't have convenient furring strips from which to hang the fixture. 

I hope to continue with the level of enthusiasm and focus I have had recently in order to actually get the railroad back on track, the theme for 2026. I don't think a train has run in a year!

Thursday, July 23, 2026

Phase Two Modules update

Once I installed the backdrop, some real progress on the modules is possible, and dare I say it, underway. My wife helped me, and we moved the new module into place on the L-girder ledger and up against the Nooksack section. We got it leveled and clamped it and its leg into place. 

Initial Next Steps For New Module

  • Shim at ledger corner with Nooksack module
  • Bolts at south end
  • Holes drilled for DCC bus to attach to circuit breaker
  • Double check level and bolt leg
  • A couple of screws to attach to L-girder
  • Complete mainline track to Nooksack module (gap at joint--new power district)
  • Adjust tortoise music wire at turnouts for proper operation
  • Double check electrical plan and connect DCC bus

Start Work on Ferndale Junction Module

With the new module up in place, we moved the Ferndale Junction modules to the temporary sawhorse workbench and clamped it up on its side. I hadn't noticed this before, but by turning the module around (the back is now the front) the wire color code is incorrect. My standard is for black to be out towards the aisle and red to be in towards the back of the benchwork. In this section that is reversed. 

I don't want to redo the wiring, but I do need to avoid future confusion with the wire colors. I will mark the wires with the correct colored tape. On inspection, I have several other steps that I can complete more easily while the modules are here on the workbench. 

  • Use red and black electrical tape to mark the existing bus and feeder wires
  • Install the frog juicer and connect green feeder wires
  • Add a piano hinge to the joint between the two modules
  • Add a Euro terminal strip to connect existing feeders to DCC bus at removed programming track switches
The plan for Ferndale Junction includes a fair amount of new trackwork. I will finalize that once it is in place. As I am not sure yet whether that will be a permanent or temporary placement, I might as well do what I can now!

Sunday, July 19, 2026

Backdrop Underway for Phase Two

First coat of faded sky

While I found the backdrop for this new section to be a bit of a gumption trap, once I started, progress has been moving right along. With this part of the backdrop up and painting started, I can go ahead and install the new module. 

To be honest, the real gumption trap was getting the 1/8" hardboard. A 4 X 8 sheet doesn't fit in our car, so I have to get the big box store to cut it the long way. I finally went to the local Lowes, but they were out of 1/8" hardboard. So, about a week ago, my wife and I went to a Home Depot in a neighboring town and got a piece cut at my standard backdrop height of 30" (I then plan to use the 18" offcut as valance). This photo shows the piece clamped in place against the stud wall. 


The phase two modules expand past the stud wall as does this backdrop section, so I tried to come up with a way of supporting the loose flapping half of the hardboard. Ultimately the bottom will be attached to the Ferndale module, but I wanted to prevent the sheet from getting too wavy. In this photo, one can see the 2 X 2 glued along the edge and the support boards glued along the top and bottom of the half of this backdrop that, at least for now, will be just be loosely hanging, projecting out from the half attached to the stud wall. 

Before mounting the backdrop in place I applied two coats of primer to the back of the backdrop. Hardboard, an engineered panel made with compressed wood fibers, is very susceptible to humidity changes. I really should use one of the shellac based primers rather than a latex one as acrylic latex paint does not provide as much of a barrier to water vapor. I have acrylic primer on hand, and I much prefer water cleanup, so that is what I used. It has got to be better than nothing, right?


I attached the new panel to the stud wall with small panel nails. With the backdrop finally in place, I went ahead and mounted a four foot LED 4000K light over this section. I also applied fiberglass tape and two coats of mud at the seam between the new and existing backboard panels. This photo shows the seam after a final sanding, ready for the painting stage. I used what has become my standard technique of rolling the blue and brushing white primer along the bottom with the first coat results seen in the initial photo above. 


Tuesday, June 30, 2026

Flatcar Sidequest

 

I think one more layer of weathering might be needed
After presenting at the Susquehanna Division's hands-on session on weathering last month, I felt the urge to experiment. (Yes, a total diversion from either infrastructure or Phase Two advancement.) I found a likely candidate in this InterMountain flatcar in my current roster's stash of rolling stock that needed to be checked for standards including weathering. This post  discusses both the roster and my standards. 

The flatcar came with metal wheels and when I checked with an NMRA standards gauge, they were fine. When I checked the car on my test track and coupler height gauge, the trip pin was very low and the couplers were off as well. I found the InterMountain gear boxes frustrating to work with. To make a long story short, I ended up drilling and tapping to be able to add screw mounting to the cover before installing Kaydee #58 couplers. The car's weight was below the RP 20.1 recommended weight. Even after gluing lead shot and Liquid Gravity to the underbody the car still measured underweight.  It was closer though. 

While dealing with operational standards, I went back and reread an article from the January 2025 NMRA Magazine. Charles Goodrich, MMR wrote about making the plastic deck on a flatcar look like a wooden deck. I decided to follow his techniques. After applying Dark Gray Vallejo Wash to the sides and ends of my flatcar, I tried distressing the wooden deck. I used a triangular file to deepen some of the gaps between the boards, a fine razor saw to scratch in some wood wear, and fine sandpaper to smooth any plastic snags and add variety to the paint coverage. 

The key to his technique to make "plastic flatcar decks look like wood" appears to be using Tamiya Panel Line. As the Panel Line paints were part of the weathering products I shared at the meeting, I found this to be the perfect experiment. Panel Line is typically used to emphasize shadows in molded lines, louvres, grating, and other details by allowing the paint to flow through capillary action by touching the brush to the area. Instead, I followed Mr. Goodrich's suggested approach of painting the entire wood deck, first with brown and then black. 

I took this photo after the Panel Line Accent Colors had dried overnight. It looked pretty good, but I was trying to match the look of a prototype photo. So, I tried some additional techniques as well to get to the point seen in the opening photo: 
  • Scuffing the deck with steel wool
  • Application of Pan Pastels, Neutral Gray Extra Dark, Neutral Gray Tint, and Raw Umber to the deck
  • Brushing on Grimy Black acrylic paint, both a couple of individual boards and dry brushing the stake pockets
  • Application of Bragdon Powders to the trucks, a light gray overall and a rust color to the springs
Much like scenery techniques, once a base layer of weathering is down, adding additional layers can add to the appearance of realism. I see a couple of things that I would like to take care of in that initial photo. Yeah, one more layer!


Thursday, June 18, 2026

Ingleton and New Module Updates

Ingleton shelf ready for "action"
While it has been awhile since my last post, some work here in the basement has gone on. In addition to helping my wife with gardening and rewilding, I have been getting some things done. I cut, painted, and installed a "baseboard" for the stud wall behind Ingleton, and I installed a hardboard valance above the shelf. While the long term plan for this area is to be the final TOMA section, a harbor scene, for now I want to try out the design concept for a valance here to both hide the LED light fixture and suggest a a more finished presentation of the scene. My feeling is that I'm ready to either bring out some rolling stock for trial operations or renew scenery work here on this independent shelf layout. 

Although I am not that far along with the new module, some progress has been made there as well. I moved through the first phase of trackwork and wiring starting with the two turnouts. They are both in place and soldered to a short spacer between them with frog feeders and feeders in the spacer dropped. In addition to drilling holes for the feeders, I cut slots in the roadbed and plywood below the throw bars so that the spring wires from the switch machines can later be installed.


Once the turnouts were in place, I added a full length of flex track to the main with feeders dropped and temporarily fastened everything in place with a couple of track spikes. Then I turned the module up on its side and installed the DCC bus. I went ahead and attached the power feeders with suitcase connectors. The next step while the frame is still up on its side will be to wire and install the Tortoise switch motors. I found that I do have the two necessary switch motors, but they may not have long enough spring wires. 

My thinking now is that I want to get a lot of the work done under the module, before mounting it in place. Before mounting it, I should extend the backdrop behind it. Once it is in place, it will be time to prep and paint another section of the basement floor. To keep up with our plans outside, I need to put in a fair amount of time teaming with my wife on those projects, but I can still make progress with the railroads. 

Saturday, May 30, 2026

TOMA Phase Two: Infrastructure

 

Floor paint, second coat
In trying to avoid making the same mistake over and over, I transitioned to some "infrastructure" work since the last couple of posts. Painting the basement floor has been another in a long line of gumption traps for me. Despite having made some additional progress on the trackwork on the new module, I took it down from the temporary workbench and forced myself to tackle painting the floor. 

Starting with the area under the future location of "Phase Two" and along the Ingleton shelf seemed like a logical location. With the area emptied of stuff, I swept, shop vacced, and washed this segment of the floor. According to online pundits, painted concrete floors don't like hot water or acidic cleaners, so rather than my wife's initial suggestion of vinegar and hot water, I used warm water and a few drops of dishwashing soap. Again, according to the pundits, I used a damp sponge mop instead of really soaking the floor with a wet mop. I don't know if success was from following the experts, but all the paint appears to be maintaining adhesion.

Painting the floor in front of the Ingleton shelf doesn't quite complete the so-called infrastructure work there. (I think I picked up the use of the term infrastructure for work supporting the model railroad from Mike Hauk.) The little stud wall here is sheathed with homasote, and past water damage had warped the bottom. Before painting the floor, I cut out the worst of the deformed bottom on the one side. I cut a piece of clapboard salvaged from the "bar" and will use it as a baseboard. I also need to figure out the valance to hide the LED light and better frame the scene in this mini-layout. 

Behind Ingleton's stud wall, a set of built in shelves will support the railroad with storage. The framing supporting these shelves also has some water damage on one side. I plan to sister in some support, and I cut two 2X4s to do just that. The floor in the same area has a spot that is always wet. It can be seen in this photo. I plan to experiment with a hydraulic concrete patch here. That will need to be patched and allowed to dry before I can continue painting the floor here behind the stud wall. 

I definitely want to continue with the work around the Ingleton shelf before moving back to the track and electrical work on the new module. After painting the floor, with just a couple of steps on the location for the new module, its new home will be ready, and I can transition from a focus on infrastructure back to model rainlorading.

Saturday, May 9, 2026

New Module -- Roadbed and Track, Part 1

The roadbed jigsaw pieces fit together

 In my last post, I mentioned next steps as working on the new module as well as completing some infrastructure work. I have, for the most part, focused on the new module in the last couple of weeks. However, before moving the module back to the sawhorses, I gathered up some of the tools and materials from the train room expansion projects and moved them out to the garage. In doing so, I was able to liberate the red work cart for actually working on the railroad. 

The puzzle is underway

I ended up piecing the roadbed together from a variety of materials. I had some cork on hand, but not enough to complete the whole module. I ordered some Walthers closed cell foam roadbed when I first ordered supplies for this project. Also, I found that I had one piece of cork turnout pad. Remembering my experience reclaiming modules, I used Elmer's white glue instead of Weldbond in case I would need to make changes. Again, I used a combination of nailing, clamping, and weighting to affix the roadbed materials. 

Putty in the gaps
With the assortment of types of roadbed and methods of attaching it, I had a bit of a learning curve. As I moved forward, I continued to double check with the track markings and the track itself. Facing turnouts and the full width foam were both new to me, so finding the one turnout pad in my bin of track parts helped. Clicking to enlarge the photos, one can see the pice of cork that I cut to fill a void. I traced the odd shape on a piece of paper and used it as a template. While it took a few days to fit the jigsaw pieces of roadbed together, it all came together. In this photo, I had just finished filling gaps in the roadbed and the screw divots with putty. 

The trackwork starts with the turnouts
With the roadbed in place and the cork painted an initial gray color, it was time to move on to starting the track and wiring. I started with the Peco turnouts. I have discussed prepping Peco turnouts before such as here or here. At this point I have isolated the frog and have a feeder soldered that will later run to the Tortoise switch machines. As I am using the switch machines on these two turnouts, I also removed the tiny spring in the turnouts. Back in my modular railroading days in Seattle, we discovered the possibility of creating shorts with the spring in place when using switch motors to change polarity. 

Now it is time to move on with fitting the track together and dropping feeders. As I solder the feeders under the rail as I lay the track, these two steps are taken together, rather than the typical lay track and then add feeders. I may take a brief break in working on this new module, as I will be prepping for a group clinic on weathering without an airbrush at my NMRA division's next in-person meeting.